parking_lot_laredo

Ongoing Projects

2016: TxDOT Aviation; Weslaco County Airport,

Mid Valley Airport-T65:

Extension of Runway, Extension of Taxiways.

ongoing_westlaco_8_12
weslaco_map

Past Projects

2016: Killam Industrial Park Unit 17, Laredo Texas

Clearing and rough grading.  Clear brush, cut parking areas and building pad for new warehouse to grade and process. Finish work.  Cut parking areas down for caliche and then spread and process caliche. Finish caliche to prep for asphalt.

killam_industrial_park
Screen Shot 2016-07-27 at 6.11.52 PM

2015: General Contractor : TxDOT Aviation; Live Oak County AirportGeorge West, TX: Rehabilitation of Runway, Taxiway and Hangar Access

 

Runway 13-31 Rehabilitation:
Crack repair and Seal
Coal Tar Emulsion
reflective paint markings
Electrical Upgrades:
Runway edge lighting (LED)
Threshold lighting (LED)
PAPI Unit installs
Electrical vault precast building install
Installation new vault equipment
Apron Reconstruction:
Blending and processing existing apron into sub grade
hauling in and processing A-2 flex base to final finish 100% compaction
HMA Type D 2" thick paving
Aircraft Tie down Anchors
reflective paint striping
Taxiway Reconstruction:
Blending and processing existing apron into sub grade
hauling in and processing A-2 flex base to final finish 100% compaction
HMA Type D 2" thick paving
reflective paint striping
Hangar Extension:
Excavation and haul out of unsuitable sub grade
hauling in and processing A-2 flex base to final finish 100% compaction
HMA Type D 2" thick paving
reflective paint striping
Segmented Circle:
Demo of existing segmented circle
Reconstruction of segmented circle
live_oak_airport_lrg
Screen Shot 2016-07-22 at 10.34.31 AM

2015: Brush Cat Services;

Construct dredge catch basin, Canyon Port, Harbor Island, Texas

Canyon_Port
Screen Shot 2016-07-22 at 10.34.51 AM

2015-2016: General Contractor for the La Salle County CourthouseBack Up Generator Installation, Cotulla, Texas  

The La Salle County Courthouse Backup Generator project consisted of installing an alternate source of power during outages.  Because of the Historical value of the Courthouse, extra steps were included in the project to protect and preserve guidelines set by the THC (Texas Historical Commision).  Scope of work included, concrete demo, structural concrete, and directional boring.

laSalle_generator
Screen Shot 2016-07-22 at 10.43.58 AM

2010-2015: ConocoPhillips;

Construct drilling pad sites, roads, frac ponds, down size pad sites, backfill reserve pits, berms, erosion control, creek crossings and other miscellaneous oilfield service jobs. Over 1200+ completed projects.

 

2012-2015: Murphy Exploration and Production;

Construct drilling pad sites, roads, frac ponds, down size pad sites, backfill reserve pits, berms, erosion control, creek crossings and other miscellaneous oilfield service jobs.

 

oilfield_work

2007-2015: Comstock Oil & Gas:

Construct drilling pad sites, roads, frac ponds, down size pad sites, backfill reserve pits, berms, erosion control, creek crossings and other miscellaneous oilfield service jobs.

 

2004-2015: EOG Resources, Inc. Construct drilling pad sites, roads, frac ponds, production facility pad sites, down size pad sites, backfill reserve pits, berms, erosion control, creek crossings and other miscellaneous oilfield services provided. Over 2000+ completed projects.